Jérusalem, Israel - 2015
Demolition and reconstruction of the central part of this house hosting three families. The walls, conceived using the magnum Board system, were prefabricated in France.
The shipment was made by container, the container itself being part of the pieces of the new central part of the house, avoiding any material waste.
The assembly on site was over within only three days. The finishing touches were made by local teams, on a normal period of five to eight weeks.